Water Infrastructure Delivered
Eastern Kosi Canal Modernisation
Modernisation of the Eastern Kosi Main Canal system spanning 124 km across Saharsa and Madhepura districts. Scope includes concrete lining, regulation gates, SCADA-controlled flow management, distributary works and command-area drainage to lift irrigation coverage and water-use efficiency.
Location
Saharsa–Madhepura
Timeline
November 2019 → March 2022
Value
₹ 386 Cr
Model
EPC (Design–Build)
Team
90 engineers · 780 workforce
Project Highlights
Key delivery elements.
- 124 km of canal lining with command-area drainage
- SCADA-controlled regulation across 18 head works
- Modernised 48 distributary outlets and 6 escape regulators
- Coverage of 86,000 hectares of irrigated command
- Sub-soil drainage to reduce waterlogging
Scope of Work
Engineering delivered, end-to-end.
Modernisation of the Eastern Kosi Main Canal system spanning 124 km across Saharsa and Madhepura districts. Scope includes concrete lining, regulation gates, SCADA-controlled flow management, distributary works and command-area drainage to lift irrigation coverage and water-use efficiency.
Delivery Model
EPC (Design–Build)
Duration
28 months
Site Team
90 engineers · 780 workforce
Compliance Stack
Standards governing this engagement.
- ISO 9001:2015
- IS 9451 / IS 4515
- CWC guidelines
- NABL water testing
Documentation available on request