Roads & Highways Under Execution
Patna–Gaya Six-Lane Expressway
A 168 km six-lane access-controlled greenfield expressway connecting Patna to Gaya, executed under the MoRTH Bharatmala programme. The contract covers complete design and build — earthwork, pavement, structures, drainage, signage, lighting and an Advanced Traffic Management System (ATMS).
Location
Bihar
Timeline
March 2023 → February 2026
Value
₹ 1,240 Cr
Model
EPC (Design–Build)
Team
320 engineers · 2,400 workforce
Project Highlights
Key delivery elements.
- Access-controlled greenfield alignment across 5 districts
- 14 major bridges including 4 river crossings
- Three interchanges and twelve vehicular underpasses
- Designed to IRC:SP:99 / IRC:73 specifications
- Smart traffic management with ATMS integration
Scope of Work
Engineering delivered, end-to-end.
A 168 km six-lane access-controlled greenfield expressway connecting Patna to Gaya, executed under the MoRTH Bharatmala programme. The contract covers complete design and build — earthwork, pavement, structures, drainage, signage, lighting and an Advanced Traffic Management System (ATMS).
Delivery Model
EPC (Design–Build)
Duration
36 months
Site Team
320 engineers · 2,400 workforce
Compliance Stack
Standards governing this engagement.
- ISO 9001:2015
- ISO 14001:2015
- ISO 45001:2018
- MoRTH specifications
- IRC codes
Documentation available on request
Related Engagements
Browse complete portfolio